| Our Commitment |
 |
Improve customer satisfaction |
 |
Reduce Line Losses |
 |
Increase revenue generation |
 |
Weed out corruption |
| |
|
| Management
philosophy |
 |
Open door policy for all |
 |
Tackle all problems upfront |
 |
Merit, justice, fair play be the hallmark |
 |
Transparency in all fields and accountability of everyone
|
| |
|
| |
|
|
|
Introduction |
|
QESCO
is operating as a Power Distribution Company and will act as
Private Organization on switching over from Public to Private
Sector. QESCO is dealing with Power Supply System in the whole
Balochistan less District Lasbela. It is smallest in terms of
consumers but largest as it covers 43 % area of Pakistan. The
peak demand at the moment is 1177 MW evaluating measures and
anticipated to be 1659 MW by the year 2015 with 8 % uniform
annual growth. QESCO system is under stress due to huge number
of Agri: Consumers contributing about 70-80 % of Power Demand.
Low voltage profile prevails due to long distances from
Generating Sources, besides availability of Single 220 KV
sources from Guddu. The safe drawl of power is 721 MW. To have
additional source another 2x220 KV Dadu-Khuzdar & DG Khan-Loralai
Transmission Lines stands approved through out source funding at
the cost of Rs 5.437 and 5.089 billion respectively. Hopefully,
the work completion in totality is expected ending 2011. A plan
of rental Power House at Quetta, Sibi and khuzdar is also in
offering. With the commissioning of these 2x220KV sources and
rental Power Houses, the low voltage profile problems which
specially persist as a common feature in entire Balochistan will
be eliminated all together besides availability of additional
600-700 MW Power for province. Also an eventual addressal
towards load management. |
| |
|
| |
|
|
 |