Our Commitment

Improve customer satisfaction

Reduce Line Losses

Increase revenue generation

Weed out corruption

 

 

Management philosophy

Open door policy for all

Tackle all problems upfront

Merit, justice, fair play be the hallmark

Transparency in all fields and accountability of everyone

 

 

 

 

Tariffs

Tariff Category/Particulars

Energy Charges Ps/Kwh

FAS
Ps/Kwh

Additional Surcharge

Surcharge 10.4%

Variable Charges 

Tariff A - General Supply
 

A-I Domestic Consumers

Upto 50 units

0.61

0

0.73

0.0634

2.00

For 1st 100 units (1-100)

0.41

0.43

1.72

0.0874

5.79

For Next 200 units (101-300)

0.58

0.43

2.52

0.1050

8.11

For Next 700 units (301-1000)

1.51

0.43

4.01

0.2018

12.33

Above 1000 units

1.88

0.31

4.99

0.2278

15.07

Note: 6 piasa subsidy born by Federal Govt for domestic consumers whose consumption more than 50 units.

Minimum Charges of Rs. 75 for Single phase and Rs. 150 for Three Phase
Back to top

Tariff A - General Supply
 

A-II Commercial Consumers upto 20 KW

Tariff Category/Particulars

Fixed Charges

Energy Charges

FAS

Additional Surcharges

Surcharge (10.4%)

Variable Charges

For Sanctioned Load less than 5 KW

 

  400

2.70

0

4.50

0.2808

14.77

For Sanctioned Load 5 KW and Above

 

  400

2.94

0

4.36

0.3058

  9.72

For peak load (Above 20KW)

 

267.17

1.09

0.12

3.25

0.1258

13.20

Minimum Charges of Rs. 175 for Single phase and Rs. 350 for Three Phase
Back to top

Tariff B - Industrial Supply
 

             Normal Tariff

Tariff Category/Particulars

Fixed Charges

Energy Charges

FAS

Additional Surcharges

Surcharge (10.4%)

   Variable

   Charges

B-1

(Up to 25 KW)

(at 400/230 Volts)

100.00

1.81

0.13

3.48

0.2018

   10.51

There shall be minimum monthly charges of Rs. 350/month for B-1.
There shall be minimum monthly charges of Rs. 2,000/month for B-2.
There shall be minimum monthly charges of Rs. 50,000/month for B-3.
There shall be minimum monthly charges of Rs. 500,000/month for B-4.

B-2 (a)

400.00

1.30

0.13

2.3513

0.1487

9.14

 

B1  (b)                   

(Up to 25 KW)                    

 

B2  (b)

(Above25-500)

 

 

B-3

 

400.00

 

 

400.00

 

 

 

 

380

-

 

 

-

 

 

 

1.29

-

 

 

-

 

 

 

0.13

  -

 

 

  -

 

 

 

2.0100

   -

 

 

   -

 

 

 

0.1477

 

13.99 (Peak)

8.22 (Off Peak)

 

12.77 (Peak)

 8.01 (Off Peak)

 

12.68 (Peak)   5.69(off-  peak)

 

B-4

 

360

1.24

0.13

1.86

1.425

 

12.37 (Peak) 7.46 (off-peak)

TOD Tariff

B-2(b)(Off Peak)

364.32

1.20

0.13

2.42

0.1383

6.27

B-2(b) (Peak)

364.32

1.98

0.13

2.68

0.2194

10.27

B-3 (Off Peak)

352.18

1.15

0.13

1.8969

0.1331

5.69

B-3 (Peak)

352.18

1.97

0.13

2.0816

0.2184

9.90

B-4 (Off Peak)

340.03

1.11

0.13

1.78

0.1290

5.33

B-4 (Peak)

340.03

1.87

0.13

2.08

0.2080

9.55

Back to top

Tariff C - Bulk Supply
 

Tariff Category/Particulars

Fixed Charges

Energy Charges

FAS

Additional Surcharges

Surcharge (10.4%)

Variable Charges

Rs/KWH

C-1(a) upto 5KW

-

1.24

0.34

3.9357

0.1643

11.55

C-1(b) Between 5 & 500 KW

400.00

1.09

0.34

3.6913

0.1487

10.35

C-2(a) Upto and Including 5000 KW

380.00

1.06

0.34

3.4144

0.1456

10.25

C-3(a)Above 5000 KW

360.00

1.04

0.34

3.3365

0.1435

10.10

Back to top

Tariff D - Agriculture
 

Tariff Category/Particulars

Fixed Charges

Energy Charges

FAS

Additional Surcharges

Surcharge (10.4%)

Variable Charges

Rs/KWH

D1.(a) Scarp less than 5 KW

-

1.26

0.36

3.6215

0.1685

10.00

D2 Agriculture Tube Wells

87.44

0.90

0.36

1.8890

0.1310

6.77

D1. (b) Scarp and Agricultural more than 5 KW

87.44

0.75

0.36

1.6446

0.1154

 

13.00 (Peak)   8.00 (Off-peak)

Back to top

Tariff E - Temporary Supply
 

Tariff Category/Particulars

Energy Charges Ps/KWH

FAS Ps/KWH

Additional Surcharges Ps/KWH

Surcharge (10.4%)

Variable Charges Rate Rs/KWH

E-1(i) Residential Supply

211

49

368

27

15.50

E-1(ii) Commercial Supply

374

0

474

39

15.00

For above two categories, the minimum bill shall be Rs. 46/- per day subject to minimum of Rs. 200 for entire period of supply, even if no energy is consumed.

E-2(i) Industrial Supply

236

13

351

26

11.50

E-2(ii-a)

176

34

385

22

617

E-2(ii-b)

164

34

362

21

581

E-2(iii)

185

34

367

23

609

Back to top

Tariff F - Seasonal Industrial Supply
 

Tariff Category/Particulars

Energy Charges

FAS

Additional Surcharges

Surcharge (10.4%)

Variable Charges

125% of the relevant industrial tariff.

Back to top

Tariff G - Public Lighting
 

Tariff Category/Particulars

Energy Charges Ps/KWH

FAS Ps/KWH

Additional Surcharges Ps/KWH

Surcharge (10.4%)

Variable Charges Rate Rs/KWH

G-1 (i)

As per general supply tarrif A-1

G-1 (ii)

193

39

457

24

13.73

Fixed line charges per month per mile

G-2 (i)

253 Rs.

-

-

-

253

G-2 (ii)

23 Rs.

-

-

-

23

G-2 (iii)

158 Rs.

-

-

-

158

G-2 (iv)

33 Rs.

-

-

-

33

G-2 (v)

Rates to be negotiated

Back to top

Tariff H - Residential Colonies attached to Industrial Premises
 

Tariff Category/Particulars

Energy Charges Ps/KWH

FAS Ps/KWH

Additional Surcharges Ps/KWH

Surcharge (10.4%)

Variable Charges Rate Rs/KWH

H-1

145

49

402

20

12.92

H-2

146

49

404

20

619

Back to top

Tariff I - Supply for Railway Traction
 

Tariff Category/Particulars

Energy Charges

FAS

Additional Surcharges

Surcharge (10.4%)

Variable Charges Rate Rs/KWH

Tariff-1

1.02

0.49

4.02

0.1570

    5.69

Back to top

Tariff J - Co Generation
 

Tariff Category/Particulars

Energy Charges Ps/KWH

FAS Ps/KWH

Additional Surcharges Ps/KWH

Surcharge (10.4%)

Variable Charges Ps/KWH

J-1 (sale of power)

174

40

336

22

572

J-2 (a) Purchase of power(During Dec. to July)

103

0

0

11

114

J-2 (b) Purchase of power(During Aug. to Nov.)

78

0

0

8

86

Back to top

Tariff K - Special Contractors
 

Tariff Category/Particulars

Energy Charges

FAS

Additional Surcharges

Surcharge (10.4%)

Variable Charges

K-1 (a) For AJK Govt.

1.10

0.41

0.23

0.1570

3.17

K-1 (b) For supply to KESC

-

-

369

-

369

K-1 (c) For High voltage and short circuit

1.88

0.28

2.56

0.2246

4.94

Back to top

 

Most Wanted

Download New Connection Application Form

Customer Service Centers

Tariffs

Cash Collection Branches

Installment Powers

Disconnection Policy

Reconnection Policy

Detection Policy

Extension of Load

Shifting of Connection

Safety Procedures

 

Providing you the best services

Feedback

We always welcome the feed back of our gracious customers who   have played a vital role in improving our quality of service send your feed back to feedback@qesco.com.pk

 

 

 

 

|Copyright @MIS QESCO|